Part of a concept known as Intelligent Transportation Systems (ITS), smart call boxes
are “multipurpose data processing and transmission systems using independent solar
power supplies and wireless communications.” Figure 1 illustrates the basic
components of smart call boxes. Consisting primarily of “a microprocessor, a cellular
telephone transceiver, and a solar power source,” the overall system “also includes
field data-collection devices such as traffic counters, weather sensors, or video
compression devices; call-box maintenance computers; and some type of data handling
system at a central location, such as a transportation management center (TMC).”

A smart call box system in San Diego, California was one of the first field operational
tests (FOTs) completed in a 1992 Federal Highway Administration (FHWA) program.
The purpose of the FOT “was to determine whether smart call boxes are a feasible and
cost-effective means of performing specified data processing and transmission tasks.”
James H. Banks and Patrick A. Powell discussed the results of a technical evaluation
of the FOT in an article entitled “San Diego Field Operational Test of Smart Call Boxes-
-Technical Aspects,” published in Transportation Research Record 1603.
Results revealed that system integration was a major technical difficulty, coupled with
pervasive reliability problems that will require further testing.
Banks and Powell discussed the FOT’s key institutional aspects in a related paper:
“San Diego Field Operational Test of Smart Call Boxes–Institutional Issues,” also
published in Transportation Research Record 1603. An article in this issue of
Road Management and Engineering Journal called
“Institutional Lessons
Learned from Examining a California Smart Call Box Study” reviews their findings on
institutional issues.
BACKGROUND
In California, smart call boxes were viewed “as a way to achieve greater use of existing
infrastructure” (namely existing call boxes). Smart call boxes would not require
electrical or telephone wiring, a significant cost advantage. In addition, existing call
boxes had already been crash-tested, essentially eliminating the need for additional
costly and time-consuming crash tests.
To perform their multiple functions, smart call boxes require: (1) an independent solar
power supply, (2) microprocessors for processing data, (3) transceivers for transmitting
data, and (4) a means of continuous access from a centralized location, such as a
TMC. Design features that must be developed to meet these requirements include:
system architecture and integration, a power supply, physical conductivity,
transmission sequencing, and integration with the TMC. System architecture and
integration present significant issues because of the relationship between components
and data processing and because of the “major design challenge” of system integration
(given that many of the smart call box’s components are not designed to work
together).
METHODS
The smart call box FOT was an interagency project, including, among others, FHWA,
the California Department of Transportation (Caltrans), and San Diego State University.
Two vendor teams–GTE Telecommunications Systems and U.S. Commlink
(USCL)–designed and installed the test systems.
The FOT consisted of five subtests evaluating the effectiveness of smart call boxes for
various functions at various sites. The functions evaluated included: (1) traffic census,
(2) incident detection, (3) weather reporting, (4) changeable message sign control, and
(5) closed-circuit television surveillance.
For the traffic census subtest, each vendor provided two system configurations using
loop-detector counters “to process and transmit traffic census data.” USCL provided an
additional system that used an infrared detector counter.
The incident detection subtest was limited to detecting traffic congestion by processing
and transmitting incident alarms. Both vendors provided a loop-detector counter
system, and USCL also provided an infrared detector counter system.
The detecting and reporting hazardous weather conditions subtest was designed “to
process and transmit hazardous weather alarms,” specifically “low-visibility conditions
and high winds.” Both vendors provided a low-visibility alarm system, and USCL also
provided a high-speed wind alarm.
The changeable message sign (CMS) subtest was canceled because of “institutional
and technical problems.” Originally, it was believed that smart call boxes could be
used to control CMSs.
The closed-circuit television (CCTV) surveillance subtest involved controlling video
cameras and transmitting video signals. The subtest was planned to include “both
fixed-field-of-view (FFOV) and remotely controlled pan-tilt-zoom (PTZ) units,” with both
vendors providing both units. Communications problems eliminated the PTZ portion.
GTE could not meet installation deadlines and was dropped from the subtest. USCL
installed two FFOV systems, one monochrome and the other color.
LIMITATIONS
The FOT faced significant limitations. Scheduling delays left too little time to
adequately collect data and iron out “initial design flaws” in the systems. Nor did the
systems operate long enough to effectively evaluate reliability. In addition, the
resources of the FOT necessitated abandoning the system’s integration with the TMC.
Neither vendor was “necessarily required” to design systems that would incorporate all
the design features or resolve all the issues created by those features. Both vendors
were also given “near-complete freedom” with their system architecture. Efforts were
compromised by inadequate solar power supplies, and “neither vendor made much use
of call-box microprocessors for data processing.”
RESULTS
The systems designed and tested only satisfied the smart call box criteria “to a limited
extent.” Each system was evaluated for “functional adequacy and reliability,” as
indicated by results in Table 1. With the exception of the infrared system, each system
“for the most part” satisfied performance criteria. Unfortunately, in some cases
performance criteria “may have been inadequate.” For example, in the hazardous
weather reporting subtest, “decisions about required alarm conditions were
postponed,” and “in all cases, systems were designed to respond to only a single level
of visibility or wind speed.” In addition, the incident detection and weather systems
(both of which used alarms) “suffered from the decision to exclude issues related to
integration of data into TMC operations.”
System
Remarks
Traffic Census
GTE External
Yes
Yes
No
GTE Internal
Yes
Yes
No
USCL External
Yes
Yes
No
USCL Internal
Yes
Yes
No
USCL Infrared
Marginal
No
No
Incident Detection
GTE Internal
Yes
No
N/A
USCL External
Yes
No
Insuff.data
USCL Infrared
Marginal
No
No
Weather
GTE Visibility
Yes
Yes
Yes
Standards inadequate
USCL Visibility
Yes
No data
Insuff. data
USCL Wind
Yes
Yes
Insuff. data
CMS Control
No
N/A
N/A
Test cancelled
CCTV Surveillance
USCL B/W
Yes
Yes
No
USCL Color
Marginal
Yes
Insuff. data
In general, the “traffic census systems based on loop detectors appeared to function
adequately” (though accuracy was often not verifiable), but the infrared detector system
did not (also accuracy-related). In addition, “all the traffic census systems had
significant reliability problems, involving extensive down time at all but one test site.”
The weather alarm systems were judged to have “functioned satisfactorily to the extent
that they sent alarms at times that appeared reasonable.” However, the same could
not be said of the incident detection systems. System integration was the most likely
culprit in the GTE system, which sent only one alarm in three months. The USCL
systems sent a number of alarms, but their time patterns did not seem reasonable, and
the alarm-time patterns from the infrared system were “clearly . . . unreasonable.” The
CCTV systems seemed to function adequately, but the color system was limited by the
PTZ problem, and the monochrome system failed for unknown reasons three or four
weeks into the project.
Cost estimates showed that capital costs varied significantly among the test sites.
When compared with a hardwire telephone system, the smart call box enjoyed a
“significant [cost] advantage” in relation to access, and a “slight advantage” in
telephone charges. Maintenance costs could not be estimated because of the project’s
limited duration.
CONCLUSIONS
System integration problems were “the major technical surprise in the FOT.” They
might be circumvented by adopting “a standard communications protocol for devices
interfacing with smart call boxes.” However, “it is questionable that the potential
market for smart call boxes is large enough to support development and use of such a
protocol by vendors of intelligent data-collection devices.”
Instead, a more “attractive” (i.e., cost-effective) approach “would be a single-purpose
data-collection system involving solar power and a cellular modem.” For future
consideration, “systems that use a single traffic counter to provide incident detection
and traffic census functions, weather-alarm systems that can download data, and
monochrome CCTV systems that monitor fixed objects all appear to have potential.”
Functional adequacy proved a more achievable goal than reliability, and the relatively
minor problems with the former could prove correctable with more testing. However,
“with the exception of the GTE weather-alarm systems, reliability was not demonstrated
for any of the test systems.” Further tests to achieve reliability are a must before any of
these systems are operational.
Overall, smart call boxes are cost-effective (when compared with a hardwire telephone
system) as long as they meet functional adequacy, reliability, and maintenance-cost
requirements. However, the boxes lose cost-effectiveness points when compared with
single-purpose, intelligent data-collection/cellular modem systems.